![]() ![]() If the machine is equipped with a front jack cylinder, the front jack cylinder shall be set in accordance with written procedure.For outrigger operation, outriggers shall be properly extended with tires raised free of crane weight before operating the boom or lifting loads.Depending on the nature of the supporting surface, it may be necessary to have structural supports under the outrigger floats or tires to spread the load to a larger bearing surface. The machine shall be leveled on a firm supporting surface.The operator and other personnel associated with the machine shall fully acquaint themselves with the latest American National Standards Institute (ANSI) Safety Standards for cranes. Operation and maintenance of this machine shall be in compliance with the information in the Operator’s and safety handbook, service manual, and parts Modifications to the machine or the use of optional equipment other than specified may result in a reduced capacity.Ĭonstruction equipment can be hazardous if improperly operated or maintained. ![]() The nominal loads shown in the lift chart are for each machine as originally manufactured and equipment.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |